For the facility with a capacity of 230 kW (2nd category of electricity supply), the following works were carried out:
Project development;
Installation of four 0.4 kV cable lines from the 0.4 kV switchgear of the 10/0.4 kV transformer substation (under construction) to the OPU-1 and VPU-2 of the utility service complex;
Installation and commissioning of the electricity metering system and automated control and protection system in accordance with the requirements of DTEK ‘Kyiv Electrical Networks’;
Development of the internal power supply system and installation of the protective grounding system.